Siemens PLC programming – TIA Portal, Safety, machine and line commissioning
SIEMENS • SAFETY • TIA PORTAL
Looking for a PLC programmer? Siemens controllers for over 10 years: S7-1500/1200, TIA Portal V13–V21, Safety, commissioning. Reply within 24 hours.
Siemens PLC programming has been our core specialisation for over 10 years: TIA Portal V13–V21, classic STEP7, Safety Integrated and F-CPU. We have completed more than 20 commissioning projects on three continents, from single machines to complete production lines.
For PLC programming we use AI agents every day: our own TIA Openness integration and the coding agents Claude Code, Pi (pi.dev) and Codex. Repetitive blocks, tags and documentation are produced in minutes instead of hours, while the engineer works on process logic and commissioning. Every block is compiled and reviewed by us before it reaches the controller.
We also handle NCU and 840D SL, as well as Rockwell, Beckhoff, Mitsubishi and Omron platforms. We take on both new commissionings and troubleshooting in running systems – including the ones where documentation is incomplete and the code was written by someone else.
Scope of services
- AI-assisted programming via TIA Openness (local and commercial models)
- First Commissioning - initial startup from scratch
- Full production line commissioning
- Safety programming (ISO 13849-1 PL e / SIL 3)
- Support and optimization of running systems
Modification and reprogramming of existing machines
Reprogramming a machine does not require its manufacturer. We modify the software of existing machines and lines: new recipes and product variants, sequence changes, additional sensors, migration of the project to a newer TIA Portal version. We check CPU reserves and free inputs and outputs first, then make the change and test it on site while production keeps running.
Typical jobs: changing a machine program after a product change, improving cycle times and output, and removing a fault nobody could find. Machines with no documentation and no source code are a separate subject, described under machine modernization and retrofit.
Safety programming: what exactly we do
We program and validate safety functions to ISO 13849-1 up to PL e and IEC 62061 up to SIL 3: emergency stops, light curtains and scanners, speed and position monitoring, safe drive stop. We do it on Siemens F-CPU controllers, with a separate safety program, its own checksum and a validation record for every function.
The safety program is not a piece of the standard program that gets tidied up along the way. It has its own password, its own version and its own acceptance. The documentation includes what an audit asks for: the list of safety functions, validation results and as-built documentation. Lines with elevated formal requirements, with full batch traceability and material accountability, are described under machine modernization and production line integration.
PLC programming with AI agents through TIA Openness
Yes, we use AI for PLC programming. Our TIA Openness integration lets AI agents work directly in the TIA Portal project: they create and modify blocks, declare tags and DBs, write comments and documentation following skills that encode our conventions. Repetitive parts of the program are produced in minutes, and the engineer works on process logic and commissioning. Every block is compiled in TIA Portal and reviewed by a person before it reaches the controller. The agent has no access to the safety part. The same library and templates can be adapted to a plant standard, which we describe under software standardization.
Frequently asked questions
Which PLC platforms do you program?
We specialize in Siemens: S7-1500, S7-1200, S7-300/400, TIA Portal V13–V21, classic STEP7, Safety Integrated (F-CPU) and NCU/840D SL. We also work with Rockwell (Studio 5000), Beckhoff (TwinCAT), Mitsubishi and Omron.
Do you program safety systems?
Yes. We implement safety functions to ISO 13849-1 up to PL e (SIL 3 to IEC 62061) on Siemens F-CPUs, including programming, validation of each safety function and the documentation for your conformity assessment.
How long does a production line commissioning take?
A typical machine commissioning takes 1–3 weeks, a complete line 4–12 weeks depending on complexity. With 20+ commissioning projects on three continents behind us, we give realistic schedules at the quotation stage.
Can you modify the program of an existing machine?
Yes – modifying machine software is our daily work: new recipes, additional sensors, sequence changes, cycle improvements. We check CPU reserves and free I/O, make the changes and test on site. We also reprogram machines built by other manufacturers and integrators. Machines with no documentation or source code are described under modernization and retrofit.
Can a new function be added to an old machine?
In most cases yes: new recipes and product variants, extra sensors, changed operating sequences or communication with higher-level systems (MES, traceability). We first check CPU reserves and spare I/O, then present the scope and quote for extending the program.
Do you use AI for PLC programming?
Yes, through our own TIA Openness integration with AI agents (local and commercial models) and a set of skills that encode our conventions. The agent generates and modifies blocks, tags, DBs and documentation directly in the TIA Portal project. Every block is compiled and checked by an engineer before download; the agent does not touch the Safety part.
Free engineering consultation
+48 505 603 607 · contact@ledniowski.com
We reply within 24 hours.
This page is also available in other languages: Polski · Deutsch